& this was the final 3D rendering we got
Things that were changed included:
- Removing the vinyl overlay (because we wanted to keep the original HDB tiles)
- Replacing our carpentry laminate with the laminate we had shortlisted
- Drawing up the tall unit carpentry for our water pipes
- Drawing in our hob & hood (though our open shelving went missing)
Not sure about you but we were quite taken aback by this final 3D rendering because the laminate was so messy compared to the previous rendering. It was definitely not what we were looking for and we scrambled to review our chosen laminate for our kitchen carpentry. I'm so glad we did, because our kitchen carpentry laminate looks so much better than whatever had been rendered out!
If you've forgotten how our kitchen looks like post-reno, scroll back up to the first photo for reference! :)
& that's all for this post!